Views
2 years ago

Uno - Installation Manual

  • Text
  • Servicing
  • Wwwaristoncom
  • Manual
  • Installation
  • Electrical
  • Terminal
  • Ignition
  • Domestic
  • Flue
  • Valve
  • Heating
  • Appliance
  • Boiler

7. MISCELLANEOUS 7.1

7. MISCELLANEOUS 7.1 WIRING DIAGRAM FOR TWO HEATING ZONES BROWN 5 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H VALVE 1 4 3 5 TYPICAL JUNCTION BOX • 1 • 2 1 9 10 3 2 E N L microGENUS 23-27 MFFI BOILER ELECTRICAL SUPPLY CABLE Remove internal time clock plug from the the P.C.B. then connect room stat terminal block on the reverse of the boiler control panel (see section 2.10) to 9 + 10 on the junction box. BOILER Based on Honeywell controls 2 2 T6360B ROOM THERMOSTAT ZONE1 BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H VALVE 1 6 3 8 2 2 T6360B ROOM THERMOSTAT ZONE 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 6 4 3 2 1 6 4 3 2 1 Pegler Sunvic SP 50/100 (Link L-3) 2 5 E N L Honeywell ST 699B 1002 Link L-5-8 6 3 N L Switchmaster Symphony, Sonata 1 4 N L ST 6400/ST 6300 ST 6200 3 4 N L Drayton Tempus 7 3 4 N L Switchmaster 400, 600 3 1 N L SWITCHMASTER 805, 900 3 1 N L Horstmann 425, 525, 527 Link L-2-5 1 4 E N L Sunvic ET 1451 Link 2-3-6 7 4 E 1 2 Landis & Gyr RWB2 Glowworm Mastermind 3 4 N L Sunvic DHP 2201 6 3 E 1 2 Landis & Gyr RWB20 Microgyr 3 4 N L Towerchron FP Link 1-5/4-7-9 6 10 2 1 Potterton Miniminder 3 4 N L Towerchron MP Link 1-4/6-11 6 10 2 1 Potterton EP2000/3000 - 3 4 N L Link L-5 EP2001/3001 Towerchron 2000 HW HTG ON ON N L Randall 102/102 E 1 2 E 5 6 Link 3-6 ACL LS522, LS722 3 4 N L Randall 4033 Link 1-6 4 2 E 7 6 Randall 922, 972 Link L-2-5 3 6 E N L Randall 701, 702 Link L-6-5 3 1 E N L Randall 3020 P and 3060 4 2 E N L Sangamo M5 1 8 E 4 3 Link 1-6 Sangamo 410 Form 1 Link 3-6 1 8 E 4 3 PROGRAMMER PROGRAMMER ZONE 1 ZONE 2 ZONE 1 ZONE 2 L 1 N 2 E 3 240V MAINS INPUT (3 AMP) If a room thermostat is not requied on Zone 1, insert a link between 4 + 5 on the junction box. If a room thermostat is not requied on Zone 2, insert a link between 6 + 8 on the junction box. SH010A 22

7.2 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER 1 4 3 5 2 2 T6360B ROOM THERMOSTAT BROWN 5 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H HEATING VALVE BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H HOT WATER VALVE TYPICAL JUNCTION BOX • 1 • 2 • 3 • 4 • 5 • 6 • 7 6 4 3 2 1 9 10 3 2 1 E N L microGENUS 23-27 MFFI Pegler Sunvic SP 50/100 (Link L-3) 2 5 E N L Switchmaster Symphony, Sonata 1 4 N L BOILER ELECTRICAL SUPPLY CABLE Switchmaster 400, 600 3 1 N L SWITCHMASTER 805, 900 3 1 N L Remove internal time clock plug from the the P.C.B. then connect room stat terminal block on the reverse of the boiler control panel (see section 2.10) to 9 + 10 on the junction box. Sunvic ET 1451 Link 2-3-6 7 4 E 1 2 Sunvic DHP 2201 6 3 E 1 2 Towerchron FP Link 1-5/4-7-9 6 10 2 1 Towerchron MP Link 1-4/6-11 6 10 2 1 Towerchron 2000 HW HTG ON ON N L ACL LS522, LS722 3 4 N L Randall 922, 972 Link L-2-5 3 6 E N L Randall 3020 P and 3060 4 2 E N L BOILER PROGRAMMER Based on Honeywell controls Cylinder thermostat 1 C/P 2 L 1 N 2 E 3 240V MAINS INPUT (3 AMP) Thermal cut-out 1 C/P 1 8 P 2 6 Not used • 8 • 9 • 10 6 4 3 2 1 Honeywell ST 699B 1002 Link L-5-8 6 3 N L ST 6400/ST 6300 ST 6200 3 4 N L Drayton Tempus 7 3 4 N L Horstmann 425, 525, 527 Link L-2-5 1 4 E N L Landis & Gyr RWB2 Glowworm Mastermind 3 4 N L Landis & Gyr RWB20 Microgyr 3 4 N L Potterton Miniminder 3 4 N L Potterton EP2000/3000 - 3 4 N L Link L-5 EP2001/3001 Randall 102/102 E 1 2 E 5 6 Link 3-6 Randall 4033 Link 1-6 4 2 E 7 6 Randall 701, 702 Link L-6-5 3 1 E N L Sangamo M5 1 8 E 4 3 Link 1-6 Sangamo 410 Form 1 Link 3-6 1 8 E 4 3 PROGRAMMER SH009A 23

MANUALS

Views
2 years ago

Uno - Installation Manual

  • Text
  • Servicing
  • Wwwaristoncom
  • Manual
  • Installation
  • Electrical
  • Terminal
  • Ignition
  • Domestic
  • Flue
  • Valve
  • Heating
  • Appliance
  • Boiler

7. MISCELLANEOUS 7.1

7. MISCELLANEOUS 7.1 WIRING DIAGRAM FOR TWO HEATING ZONES BROWN 5 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H VALVE 1 4 3 5 TYPICAL JUNCTION BOX • 1 • 2 1 9 10 3 2 E N L microGENUS 23-27 MFFI BOILER ELECTRICAL SUPPLY CABLE Remove internal time clock plug from the the P.C.B. then connect room stat terminal block on the reverse of the boiler control panel (see section 2.10) to 9 + 10 on the junction box. BOILER Based on Honeywell controls 2 2 T6360B ROOM THERMOSTAT ZONE1 BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H VALVE 1 6 3 8 2 2 T6360B ROOM THERMOSTAT ZONE 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 6 4 3 2 1 6 4 3 2 1 Pegler Sunvic SP 50/100 (Link L-3) 2 5 E N L Honeywell ST 699B 1002 Link L-5-8 6 3 N L Switchmaster Symphony, Sonata 1 4 N L ST 6400/ST 6300 ST 6200 3 4 N L Drayton Tempus 7 3 4 N L Switchmaster 400, 600 3 1 N L SWITCHMASTER 805, 900 3 1 N L Horstmann 425, 525, 527 Link L-2-5 1 4 E N L Sunvic ET 1451 Link 2-3-6 7 4 E 1 2 Landis & Gyr RWB2 Glowworm Mastermind 3 4 N L Sunvic DHP 2201 6 3 E 1 2 Landis & Gyr RWB20 Microgyr 3 4 N L Towerchron FP Link 1-5/4-7-9 6 10 2 1 Potterton Miniminder 3 4 N L Towerchron MP Link 1-4/6-11 6 10 2 1 Potterton EP2000/3000 - 3 4 N L Link L-5 EP2001/3001 Towerchron 2000 HW HTG ON ON N L Randall 102/102 E 1 2 E 5 6 Link 3-6 ACL LS522, LS722 3 4 N L Randall 4033 Link 1-6 4 2 E 7 6 Randall 922, 972 Link L-2-5 3 6 E N L Randall 701, 702 Link L-6-5 3 1 E N L Randall 3020 P and 3060 4 2 E N L Sangamo M5 1 8 E 4 3 Link 1-6 Sangamo 410 Form 1 Link 3-6 1 8 E 4 3 PROGRAMMER PROGRAMMER ZONE 1 ZONE 2 ZONE 1 ZONE 2 L 1 N 2 E 3 240V MAINS INPUT (3 AMP) If a room thermostat is not requied on Zone 1, insert a link between 4 + 5 on the junction box. If a room thermostat is not requied on Zone 2, insert a link between 6 + 8 on the junction box. SH010A 22

7.2 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER 1 4 3 5 2 2 T6360B ROOM THERMOSTAT BROWN 5 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H HEATING VALVE BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN/YELLOW 3 V4043H HOT WATER VALVE TYPICAL JUNCTION BOX • 1 • 2 • 3 • 4 • 5 • 6 • 7 6 4 3 2 1 9 10 3 2 1 E N L microGENUS 23-27 MFFI Pegler Sunvic SP 50/100 (Link L-3) 2 5 E N L Switchmaster Symphony, Sonata 1 4 N L BOILER ELECTRICAL SUPPLY CABLE Switchmaster 400, 600 3 1 N L SWITCHMASTER 805, 900 3 1 N L Remove internal time clock plug from the the P.C.B. then connect room stat terminal block on the reverse of the boiler control panel (see section 2.10) to 9 + 10 on the junction box. Sunvic ET 1451 Link 2-3-6 7 4 E 1 2 Sunvic DHP 2201 6 3 E 1 2 Towerchron FP Link 1-5/4-7-9 6 10 2 1 Towerchron MP Link 1-4/6-11 6 10 2 1 Towerchron 2000 HW HTG ON ON N L ACL LS522, LS722 3 4 N L Randall 922, 972 Link L-2-5 3 6 E N L Randall 3020 P and 3060 4 2 E N L BOILER PROGRAMMER Based on Honeywell controls Cylinder thermostat 1 C/P 2 L 1 N 2 E 3 240V MAINS INPUT (3 AMP) Thermal cut-out 1 C/P 1 8 P 2 6 Not used • 8 • 9 • 10 6 4 3 2 1 Honeywell ST 699B 1002 Link L-5-8 6 3 N L ST 6400/ST 6300 ST 6200 3 4 N L Drayton Tempus 7 3 4 N L Horstmann 425, 525, 527 Link L-2-5 1 4 E N L Landis & Gyr RWB2 Glowworm Mastermind 3 4 N L Landis & Gyr RWB20 Microgyr 3 4 N L Potterton Miniminder 3 4 N L Potterton EP2000/3000 - 3 4 N L Link L-5 EP2001/3001 Randall 102/102 E 1 2 E 5 6 Link 3-6 Randall 4033 Link 1-6 4 2 E 7 6 Randall 701, 702 Link L-6-5 3 1 E N L Sangamo M5 1 8 E 4 3 Link 1-6 Sangamo 410 Form 1 Link 3-6 1 8 E 4 3 PROGRAMMER SH009A 23