Views
3 years ago

NUOS Plus - User Manual

  • Text
  • Appliance
  • Heater
  • Heating
  • Installation
  • Operating
  • Discharge
  • Maintenance
  • Electrical
  • Technical
  • Regulations
  • Nuos
  • Manual

AIR TO WATER HEAT PUMP

AIR TO WATER HEAT PUMP COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. Customer name: Telephone number: Address: Heat Pump Make and Model Heat Pump Serial Number Commissioned by (PRINT NAME): Certified Operative Reg. No. [1] Company name: Telephone number: Company address: Commissioning date: Building Regulations Notification Number (if applicable) [2] CONTROLS - SYSTEM AND HEAT PUMP (tick the appropriate boxes) Time and temperature control to heating Room thermostat and programmer/timer Programmable Roomstat Load/weather compensation Optimum start control Time and temperature control to hot water Cylinder thermostat and programmer/timer Combined with Heat pump main controls Heating zone valves (including underfloor loops) Fitted Not required Hot water zone valves Fitted Not required Thermostatic radiator valves Fitted Not required Heat Pump Safety Interlock [3] Built In Provided Outdoor Sensor Fitted Not required Automatic bypass to system Fitted Not required Buffer Vessel Fitted Yes No If YES Volume: Litres ALL SYSTEMS The heating system has been filled and pressure tested Yes Expansion vessel for heating is sized, fitted & charged in accordance with manufacturer’s instructions Yes The heat pump is fitted on a solid/stable surface capable of taking its weight Yes The system has been flushed and cleaned in accordance with BS7593 and heat pump manufacturer’s instructions Yes What system cleaner was used? What inhibitor was used? Quantity litres Is the system adequately frost protected? Yes OUTDOOR UNIT Are all external pipeworks insulated? Is the fan free from obstacles and operational? Has suitable consideration been made for waste water discharge? Yes Yes Yes CENTRAL HEATING MODE Heating Flow Temperature °C Heating Return Temperature °C DOMESTIC HOT WATER MODE Measure and Record: Is the heat pump connected to a hot water cylinder? Unvented Vented Thermal Store Not Connected Hot water has been checked at all outlets Yes Have Thermostatic Blending Valves been fitted? Yes Not required ADDITIONAL SYSTEM INFORMATON Additional heat sources connected: Gas Boiler Oil Boiler Electric Heater Solar Thermal Other: ALL INSTALLATIONS The heating, hot water and ventilation systems complies with the appropriate Building Regulations All electrical work complies with the appropriate Regulations The heat pump and associated products have been installed and commissioned in accordance with the manufacturer’s instructions The operation of the heat pump and system controls have been demonstrated to the customer The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Yes Yes Yes Yes Commissioning Engineer’s Signature Customer’s Signature (To confirm satisfactory demonstration and receipt of manufacturer’s literature) Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and Wales must be notified to Local Area Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer. [3] May be required for systems covered by G3 Regulations © Heating and Hotwater Industry Council (HHIC) www.centralheating.co.uk

SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. Always use the manufacturer’s specified spare part when replacing controls. SERVICE 01 Date: SERVICE 02 Date: Engineer name: Engineer name: Company name: Company name: Telephone No: Telephone No: Operative ID No: Operative ID No: Comments: Comments: Signature Signature SERVICE 03 Date: SERVICE 04 Date: Engineer name: Engineer name: Company name: Company name: Telephone No: Telephone No: Operative ID No: Operative ID No: Comments: Comments: Signature Signature SERVICE 05 Date: SERVICE 06 Date: Engineer name: Engineer name: Company name: Company name: Telephone No: Telephone No: Operative ID No: Operative ID No: Comments: Comments: Signature Signature SERVICE 07 Date: SERVICE 08 Date: Engineer name: Engineer name: Company name: Company name: Telephone No: Telephone No: Operative ID No: Operative ID No: Comments: Comments: Signature Signature SERVICE 09 Date: SERVICE 10 Date: Engineer name: Engineer name: Company name: Company name: Telephone No: Telephone No: Operative ID No: Operative ID No: Comments: Comments: Signature Signature

MANUALS