Commissioning 1.12 TEST & UTILITIES 1.12.0 Air-purge function Activates deaeration of the system; the operation can last up to 18 minutes. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.12.1 Antiblocking function enable Activates the anti-lock function of the primary circulation pump. The circulation pump is activated for 30 seconds every 23 hours of inactivity and the diverter valve is set to DWH production. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.12.2 Quiet mode activation HHP Press the selector . Turn the selector to choose the desired item. 0 OFF (reduces the heat pump noise level). 1 ON Press the selector to confirm. 1.12.3 Quiet mode start time HHP [hh:mm] Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.12.4 Quiet mode end time HHP [hh:mm] Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.12.5 Floor drying cycle Defines the screed drying programme for under-floor systems using the following values: Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 Functional Heating (screed heating at a fixed temperature of 25°C for 3 days, then at the temperature defined by Par 1.12.6 Floor drying Flow Set Point T). Temperature °C 60 50 40 30 20 10 0 0 1 2 3 4 5 6 7 8 9 Period (days) Fig. 64 2 Curing Heating (screed heating at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period) Temperature °C 60 40 20 set point 55°C set point 40°C 0 0 2 4 6 8 10 12 14 16 18 20 Period (days) Fig. 65 3 Functional Heating + Curing Heating (screed heating at a fixed temperature of 25°C for 3 days, then for a further 4 days at the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, then at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period) Temperature °C 80 60 40 20 set point 55°C set point 60°C 0 0 5 10 15 20 25 30 Period (days) Fig. 66 52 / EN
Commissioning 4 Curing Heating + Functional Heating (screed heating at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period, then at a fixed temperature of 25°C for a period of 3 days, then for a further 4 days at the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T) 1.13.1 Max Admit Electricity/Gas Cost Ratio Defines the maximum allowed ratio between the unit price per kWh for electricity and gas. 1.13.2 Primary/Elec Energy Ratio Defines the conversion factor between the primary energy and the electricity consumed by the heat pump. Temperature °C 60 50 40 30 20 10 0 0 5 10 15 20 25 30 Period (days) Fig. 67 1.13.3 Gas cost Defines the cost of gas per kWh consumed. 1.13.4 Electricity cost Defines the cost of each kWh of electricity consumed. 1.13.5 Electricity cost (low tariff) Defines the cost of each kWh of electricity consumed during the reduced rate period. 1.13.6 External boiler efficiency CH Defines the estimated average performance of the AUX 1/2 boiler in heating mode. 5 Manual (screed heating at the temperature set in Par. 1.12.6 Floor drying Flow Set Point T) Press the selector to confirm. 1.12.6 Floor drying Flow Set Point T Defines the set-point temperature of the heating delivery during the screed drying function (see Par. 1.12.5 Floor drying cycle). 1.12.7 Floor drying total Remaining Days Defines the days remaining for the screed drying function. 1.12.9 Exogel kit activation Enables integration of the anti-freeze kit. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.13 ENERGY TARIFF SETTINGS Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.13.0 Min Admit Electricity/Gas Cost Ratio Defines the minimum allowed ratio between the unit price per kWh for electricity and gas. 1.13.7 External boiler efficiency DHW Defines the estimated average performance of the AUX 1/2 boiler in domestic hot water mode. 1.13.8 Delta T COP setpoint Defines the estimated thermal exchange in degrees for estimating the compressor performance in heating mode. 1.14 ENERGY MANAGER STATISTICS Shows the duration of the system operation in hours. 1.14.1 Heating running hours (h/10) 1.14.2 DHW running hours (h/10) 1.14.6 Cooling running hours (h/10) 1.15 ENERGY MANAGER INFO Shows the cost of energy used by the system. 1.15.0 kWh cost from HP actual 1.15.1 kWh cost from boiler actual 1.15.2 kWh cost from HP estimated 1.15.3 kWh cost from boiler estimated 53 / EN
Loading...
Loading...
Commissioning 1.12 TEST & UTILITIES 1.12.0 Air-purge function Activates deaeration of the system; the operation can last up to 18 minutes. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.12.1 Antiblocking function enable Activates the anti-lock function of the primary circulation pump. The circulation pump is activated for 30 seconds every 23 hours of inactivity and the diverter valve is set to DWH production. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.12.2 Quiet mode activation HHP Press the selector . Turn the selector to choose the desired item. 0 OFF (reduces the heat pump noise level). 1 ON Press the selector to confirm. 1.12.3 Quiet mode start time HHP [hh:mm] Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.12.4 Quiet mode end time HHP [hh:mm] Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.12.5 Floor drying cycle Defines the screed drying programme for under-floor systems using the following values: Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 Functional Heating (screed heating at a fixed temperature of 25°C for 3 days, then at the temperature defined by Par 1.12.6 Floor drying Flow Set Point T). Temperature °C 60 50 40 30 20 10 0 0 1 2 3 4 5 6 7 8 9 Period (days) Fig. 64 2 Curing Heating (screed heating at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period) Temperature °C 60 40 20 set point 55°C set point 40°C 0 0 2 4 6 8 10 12 14 16 18 20 Period (days) Fig. 65 3 Functional Heating + Curing Heating (screed heating at a fixed temperature of 25°C for 3 days, then for a further 4 days at the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, then at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period) Temperature °C 80 60 40 20 set point 55°C set point 60°C 0 0 5 10 15 20 25 30 Period (days) Fig. 66 52 / EN
Commissioning 4 Curing Heating + Functional Heating (screed heating at a variable temperature from 25°C to the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T, according to the period specified as an example in the chart for an 18-day period, then at a fixed temperature of 25°C for a period of 3 days, then for a further 4 days at the temperature defined by Par. 1.12.6 Floor drying Flow Set Point T) 1.13.1 Max Admit Electricity/Gas Cost Ratio Defines the maximum allowed ratio between the unit price per kWh for electricity and gas. 1.13.2 Primary/Elec Energy Ratio Defines the conversion factor between the primary energy and the electricity consumed by the heat pump. Temperature °C 60 50 40 30 20 10 0 0 5 10 15 20 25 30 Period (days) Fig. 67 1.13.3 Gas cost Defines the cost of gas per kWh consumed. 1.13.4 Electricity cost Defines the cost of each kWh of electricity consumed. 1.13.5 Electricity cost (low tariff) Defines the cost of each kWh of electricity consumed during the reduced rate period. 1.13.6 External boiler efficiency CH Defines the estimated average performance of the AUX 1/2 boiler in heating mode. 5 Manual (screed heating at the temperature set in Par. 1.12.6 Floor drying Flow Set Point T) Press the selector to confirm. 1.12.6 Floor drying Flow Set Point T Defines the set-point temperature of the heating delivery during the screed drying function (see Par. 1.12.5 Floor drying cycle). 1.12.7 Floor drying total Remaining Days Defines the days remaining for the screed drying function. 1.12.9 Exogel kit activation Enables integration of the anti-freeze kit. Press the selector . Turn the selector to choose the desired item. 0 OFF. 1 ON. Press the selector to confirm. 1.13 ENERGY TARIFF SETTINGS Press the selector . Turn the selector to choose the desired item. Press the selector to confirm. 1.13.0 Min Admit Electricity/Gas Cost Ratio Defines the minimum allowed ratio between the unit price per kWh for electricity and gas. 1.13.7 External boiler efficiency DHW Defines the estimated average performance of the AUX 1/2 boiler in domestic hot water mode. 1.13.8 Delta T COP setpoint Defines the estimated thermal exchange in degrees for estimating the compressor performance in heating mode. 1.14 ENERGY MANAGER STATISTICS Shows the duration of the system operation in hours. 1.14.1 Heating running hours (h/10) 1.14.2 DHW running hours (h/10) 1.14.6 Cooling running hours (h/10) 1.15 ENERGY MANAGER INFO Shows the cost of energy used by the system. 1.15.0 kWh cost from HP actual 1.15.1 kWh cost from boiler actual 1.15.2 kWh cost from HP estimated 1.15.3 kWh cost from boiler estimated 53 / EN
Loading...
Loading...
X