Views
10 months ago

Genus ONE+ WiFi Installation Manual

  • Text
  • Wwwaristoncom
  • Manual
  • Wifi
  • Genus
  • Maintenance
  • Efficiency
  • Appliance
  • Flue
  • Installation
  • Heating
  • Boiler
Ariston Genus ONE+ WiFi Installation and Servicing Manual

GAS BOILER SYSTEM

GAS BOILER SYSTEM COMMISSIONING CHECKLIST & WARRANTY VALIDATION RECORD Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Company name: Company email: Heating and hot water system complies with the appropriate Building Regulations? Gas Safe registration number: Telephone number: Company address: Commissioning date: Yes Time, temperature control and boiler interlock provided for central heating and hot water Boiler Plus requirements (tick the appropriate box(s)) Yes Boiler Plus option chosen for combination boiler in ENGLAND Weather compensation Load compensation Smart thermostat with automisation and optimisation Flue Gas Heat Recovery Time and temperature control to hot water Cylinder thermostat and programmer/timer Combination boiler Zone valves pre-existing Fitted Not required Thermostatic radiator valves pre-existing Fitted Not required Automatic bypass to system pre-existing Fitted Not required pre-existing Fitted Not required Water quality instructions Yes What system cleaner was used? Brand: Product: What inhibitor was used? Brand: Product: pre-existing Fitted Not required CENTRAL HEATING MODE measure and record (as appropriate) Gas rate (for combination boilers complete DHW mode gas rate) m 3/ hr or ft 3 /hr Central heating output left at factory settings? Yes No If no, what is the maximum central heating output selected? kW Dynamic gas inlet pressure mbar °C Central heating return temperature °C System correctly balanced/rebalanced? Yes COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No Water scale reducer/softener pre-existing Fitted Not required Brand: Product: Yes No If yes- DHW expansion vessel pre-existing Fitted Not required Pressure reducing valve pre-existing Fitted Not required DOMESTIC HOT WATER MODE Measure and record Gas rate m 3/ hr or ft 3 /hr Dynamic gas inlet pressure at maximum rate mbar Cold water inlet temperature °C Hot water has been checked at all outlets Yes Temperature °C CONDENSATE DISPOSAL The condensate drain has been installed in accordance with the manufacturers’ instructions and/or BS5546/BS6798 Yes Point of termination Internal External (only where internal termination impractical) Method of disposal Gravity Pumped ALL INSTALLATIONS At max rate: CO ppm CO 2 % CO/CO 2 Ratio Record the following At min rate (where possible) CO ppm CO 2 % CO/CO 2 Ratio instructions, and readings are correct? Yes The operation of the boiler and system controls have been demonstrated to and understood by the customer Yes The manufacturers’ literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Commissioning Engineer’s signature Customer’s signature © Heating and Hotwater Industry Council (HHIC) www.benchmark.org.uk

SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. © Heating and Hotwater Industry Council (HHIC) www.benchmark.org.uk

Views
10 months ago

Genus ONE+ WiFi Installation Manual

  • Text
  • Wwwaristoncom
  • Manual
  • Wifi
  • Genus
  • Maintenance
  • Efficiency
  • Appliance
  • Flue
  • Installation
  • Heating
  • Boiler
Ariston Genus ONE+ WiFi Installation and Servicing Manual

GAS BOILER SYSTEM

GAS BOILER SYSTEM COMMISSIONING CHECKLIST & WARRANTY VALIDATION RECORD Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Company name: Company email: Heating and hot water system complies with the appropriate Building Regulations? Gas Safe registration number: Telephone number: Company address: Commissioning date: Yes Time, temperature control and boiler interlock provided for central heating and hot water Boiler Plus requirements (tick the appropriate box(s)) Yes Boiler Plus option chosen for combination boiler in ENGLAND Weather compensation Load compensation Smart thermostat with automisation and optimisation Flue Gas Heat Recovery Time and temperature control to hot water Cylinder thermostat and programmer/timer Combination boiler Zone valves pre-existing Fitted Not required Thermostatic radiator valves pre-existing Fitted Not required Automatic bypass to system pre-existing Fitted Not required pre-existing Fitted Not required Water quality instructions Yes What system cleaner was used? Brand: Product: What inhibitor was used? Brand: Product: pre-existing Fitted Not required CENTRAL HEATING MODE measure and record (as appropriate) Gas rate (for combination boilers complete DHW mode gas rate) m 3/ hr or ft 3 /hr Central heating output left at factory settings? Yes No If no, what is the maximum central heating output selected? kW Dynamic gas inlet pressure mbar °C Central heating return temperature °C System correctly balanced/rebalanced? Yes COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No Water scale reducer/softener pre-existing Fitted Not required Brand: Product: Yes No If yes- DHW expansion vessel pre-existing Fitted Not required Pressure reducing valve pre-existing Fitted Not required DOMESTIC HOT WATER MODE Measure and record Gas rate m 3/ hr or ft 3 /hr Dynamic gas inlet pressure at maximum rate mbar Cold water inlet temperature °C Hot water has been checked at all outlets Yes Temperature °C CONDENSATE DISPOSAL The condensate drain has been installed in accordance with the manufacturers’ instructions and/or BS5546/BS6798 Yes Point of termination Internal External (only where internal termination impractical) Method of disposal Gravity Pumped ALL INSTALLATIONS At max rate: CO ppm CO 2 % CO/CO 2 Ratio Record the following At min rate (where possible) CO ppm CO 2 % CO/CO 2 Ratio instructions, and readings are correct? Yes The operation of the boiler and system controls have been demonstrated to and understood by the customer Yes The manufacturers’ literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Commissioning Engineer’s signature Customer’s signature © Heating and Hotwater Industry Council (HHIC) www.benchmark.org.uk

SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: SERVICE/INTERIM WORK ON BOILER delete as appropriate Date: Engineer name: Company name: Telephone N o : Gas Safe registration N o : Engineer name: Company name: Telephone N o : Gas Safe registration N o : Max rate CO ppm CO ² % CO/CO ² Max rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² Min rate CO ppm CO ² % CO/CO ² undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes undertaken in accordance with manufacturers’ instructions, and readings are correct?” yes Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No Gas rate: m 3 /h OR ft 3 /h delete as appropriate Yes No System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a System inhibitor concentration has been checked and appropriate action taken, in accordance with BS 7593 and boiler manufacturers’ instructions. * yes n/a Comments: Comments: Signature: Signature: instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers attendance visit was in between annual services to attend a non-water facing component. © Heating and Hotwater Industry Council (HHIC) www.benchmark.org.uk