INSTALLATION Fitting the Coaxial Flue (Ø 60 / 100 Horizontal) Contents: 1x Silicone O-Ring (60mm) 1x Elbow (90°) 2x Wall Seals (Internal & External) 1x Flue Pipe including Terminal (1 metre - 60/100) 2x Flue Clamps 4x Screws 2x Seals Once the boiler has been positioned on the wall, fit the rubber flue seal into the internal flue turret (see diagram opposite), Insert the elbow into the socket and rotate to the required position. note: It is possible to rotate the elbow 360° on its vertical axis. Using the flue clamp, seals and screws supplied (Fig 4) secure the elbow to the boiler. The 1 metre horizontal flue kit (3318073) supplied is suitable for an exact X dimension of 753mm. Measure the distance from the face of the external wall to the face of the flue elbow (X - Fig 2), this figure must now be subtracted from 753mm, you now have the total amount to be cut from the plain end of the flue. Note: A Plume management kit is available for 60/100 horizontal termination. Instructions for installation are supplied with the Plume management kit. Draw a circle around the outer flue and cut the flue to the required length taking care not to cut the inner flue, next cut the inner flue ensuring that the length between the inner and outer flue is maintained. (Fig 4). e.g. X = 555mm 753-555 = 198mm (Length to be cut from the plain end of the flue). Once cut to the required length, ensure that the flue is free from burrs and reassemble the flue. If fitting the flue from inside of the building attach the outer wall seal to the flue terminal and push the flue through the hole, once the wall seal has passed through the hole, pull the flue back until the seal is flush with the wall. Alternatively, the flue can be installed from outside of the building, the outer seal being fitted last. Should the flue require extending, the flue connections are push fit, however, one flue bracket should be used to secure each metre of flue. Note: See table for maximum and minimum flue runs. Clamp Seal Screws Fig. 4 Fitting the 5” Flue (Ø 80 / 125 Horizontal/vertical) Total length of Vertical Kit 1240 mm 5" Adaptor Part no: 3318095 * This length will vary according to the type of flashing installed 180 mm Useable length of Vertical flue 575 mm* Once the boiler has been positioned on the wall, it is necessary to insert the Ø80/125 adaptor (Fig. 5) for both horizontal and vertical flue runs into the boiler flue socket (not supplied with flue kit - Part No 3318095). Push the adaptor onto the boilers flue connection, grease the seals then add extensions or elbows as required, secure the adaptor, using the clamp and screws provided. To fit extensions or elbows it is first necessary to ensure that the lip seal is fitted correctly into the inner flue, once verified, it is simply necessary to push them together, no clamps are necessary to secure the flue components. Fig. 5 / 22 420011270900 - Rev. 04 - 072024
INSTALLATION Before proceeding to fit the flue, ensure that the maximum flue length has not been exceeded (See the tables) and that all elbows and bends have been taken into consideration, for each additional 90° elbow 1 metre must be subtracted from the total flue length, and for each 45° 0.5 metres must be subtracted from the total flue length (the height of the vertical adaptor and a 45° bend can be seen in Fig.6 and a 90° bend in Fig. 7). NOTE: DO NOT CUT THE VERTICAL FLUE KIT. Height = 267mm 3318092 Height = 296 mm Height = 267mm Fig. 6 Fig. 7 Fitting the Coaxial Flue (Ø 60 / 100 Vertical) Note: See table for maximum and minimum flue runs. Total length of Vertical Kit 1355 mm Useable length of Vertical flue 690 mm* Contents: 1x Conical Adaptor (60/100mm) 1x Vertical Flue Kit (80/125mm) The vertical flue kit is supplied with a specially designed weather proof terminal fitted, it can be used either with a flat roof or a pitched roof. Vert Adaptor (supplied with flue kit) 180 mm The Vertical flue kits useable lengths with the pitched roof flashings are indicated in Fig. 7. Vertical Starter Part No: 3318079 Fig. 7 * This length will vary according to the type of flashing installed Before proceeding to fit the flue, ensure that the maximum flue length has not been exceeded (See the tables) and that all elbows and bends have been taken into consideration, for each additional 90° elbow 1 metre must be subtracted from the total flue length, and for each 45° 0.5 metres must be subtracted from the total flue length (the height of the vertical adaptor and a 45° bend can be seen in Fig. 8). Mark the position of the flue hole in the ceiling and/or roof (see Fig. 7 for distance from wall to the centre of the flue). Cut a 130mm diameter hole through the ceiling and/or roof and fit the flashing plate to the roof. Fig. 8 Installation and servicing instructions / 23
TECHNICAL DATA Brand PRODUCT FICHE
TECHNICAL DATA Figure 1 Seasonal sp
Benchmark Commissioning & Warranty
SERVICE & INTERIM BOILER WORK RECOR
Manufactured by Ariston S.p.A. Vial
Loading...
Loading...
INSTALLATION Fitting the Coaxial Flue (Ø 60 / 100 Horizontal) Contents: 1x Silicone O-Ring (60mm) 1x Elbow (90°) 2x Wall Seals (Internal & External) 1x Flue Pipe including Terminal (1 metre - 60/100) 2x Flue Clamps 4x Screws 2x Seals Once the boiler has been positioned on the wall, fit the rubber flue seal into the internal flue turret (see diagram opposite), Insert the elbow into the socket and rotate to the required position. note: It is possible to rotate the elbow 360° on its vertical axis. Using the flue clamp, seals and screws supplied (Fig 4) secure the elbow to the boiler. The 1 metre horizontal flue kit (3318073) supplied is suitable for an exact X dimension of 753mm. Measure the distance from the face of the external wall to the face of the flue elbow (X - Fig 2), this figure must now be subtracted from 753mm, you now have the total amount to be cut from the plain end of the flue. Note: A Plume management kit is available for 60/100 horizontal termination. Instructions for installation are supplied with the Plume management kit. Draw a circle around the outer flue and cut the flue to the required length taking care not to cut the inner flue, next cut the inner flue ensuring that the length between the inner and outer flue is maintained. (Fig 4). e.g. X = 555mm 753-555 = 198mm (Length to be cut from the plain end of the flue). Once cut to the required length, ensure that the flue is free from burrs and reassemble the flue. If fitting the flue from inside of the building attach the outer wall seal to the flue terminal and push the flue through the hole, once the wall seal has passed through the hole, pull the flue back until the seal is flush with the wall. Alternatively, the flue can be installed from outside of the building, the outer seal being fitted last. Should the flue require extending, the flue connections are push fit, however, one flue bracket should be used to secure each metre of flue. Note: See table for maximum and minimum flue runs. Clamp Seal Screws Fig. 4 Fitting the 5” Flue (Ø 80 / 125 Horizontal/vertical) Total length of Vertical Kit 1240 mm 5" Adaptor Part no: 3318095 * This length will vary according to the type of flashing installed 180 mm Useable length of Vertical flue 575 mm* Once the boiler has been positioned on the wall, it is necessary to insert the Ø80/125 adaptor (Fig. 5) for both horizontal and vertical flue runs into the boiler flue socket (not supplied with flue kit - Part No 3318095). Push the adaptor onto the boilers flue connection, grease the seals then add extensions or elbows as required, secure the adaptor, using the clamp and screws provided. To fit extensions or elbows it is first necessary to ensure that the lip seal is fitted correctly into the inner flue, once verified, it is simply necessary to push them together, no clamps are necessary to secure the flue components. Fig. 5 / 22 420011270900 - Rev. 04 - 072024
INSTALLATION Before proceeding to fit the flue, ensure that the maximum flue length has not been exceeded (See the tables) and that all elbows and bends have been taken into consideration, for each additional 90° elbow 1 metre must be subtracted from the total flue length, and for each 45° 0.5 metres must be subtracted from the total flue length (the height of the vertical adaptor and a 45° bend can be seen in Fig.6 and a 90° bend in Fig. 7). NOTE: DO NOT CUT THE VERTICAL FLUE KIT. Height = 267mm 3318092 Height = 296 mm Height = 267mm Fig. 6 Fig. 7 Fitting the Coaxial Flue (Ø 60 / 100 Vertical) Note: See table for maximum and minimum flue runs. Total length of Vertical Kit 1355 mm Useable length of Vertical flue 690 mm* Contents: 1x Conical Adaptor (60/100mm) 1x Vertical Flue Kit (80/125mm) The vertical flue kit is supplied with a specially designed weather proof terminal fitted, it can be used either with a flat roof or a pitched roof. Vert Adaptor (supplied with flue kit) 180 mm The Vertical flue kits useable lengths with the pitched roof flashings are indicated in Fig. 7. Vertical Starter Part No: 3318079 Fig. 7 * This length will vary according to the type of flashing installed Before proceeding to fit the flue, ensure that the maximum flue length has not been exceeded (See the tables) and that all elbows and bends have been taken into consideration, for each additional 90° elbow 1 metre must be subtracted from the total flue length, and for each 45° 0.5 metres must be subtracted from the total flue length (the height of the vertical adaptor and a 45° bend can be seen in Fig. 8). Mark the position of the flue hole in the ceiling and/or roof (see Fig. 7 for distance from wall to the centre of the flue). Cut a 130mm diameter hole through the ceiling and/or roof and fit the flashing plate to the roof. Fig. 8 Installation and servicing instructions / 23
TECHNICAL DATA Brand PRODUCT FICHE
TECHNICAL DATA Figure 1 Seasonal sp
Benchmark Commissioning & Warranty
SERVICE & INTERIM BOILER WORK RECOR
Manufactured by Ariston S.p.A. Vial
Loading...
Loading...
CATALOGUE
PRODUCT BROCHURES
DATASHEETS
MANUALS
MANUALS (DISCONTINUED)
PLANNER MANUALS
CASE STUDIES