Views
3 years ago

Genus ONE Net - Installation Manual

  • Text
  • Boiler
  • Heating
  • Flue
  • Appliance
  • Installation
  • Valve
  • Efficiency
  • Maintenance
  • Display
  • Maximum
  • Genus
  • Install

COMMISSIONING FIRST

COMMISSIONING FIRST IGNITION OPERATION Date . . . . . . . . . . . . . . . . . . . . . . . . Installer . . . . . . . . . . . . . . . . . . . . . 1. Check the electrical supply. 2. Check the type of gas (change the gas if necessary durung the Calibration procedure point 8). Complete ........................................... Complete ........................................... 3. Check the gas tightness. 4. Check the Flue 5. Fill the installation. Complete ........................................... Complete ........................................... Complete ........................................... 6. Check the hydraulic water tightness. 7. Measure the gas inlet static pressure. Complete ........................................... Complete ........................................... 8. Carry out the deaeration cycle and automatic calibration procedure (change gas type, if necessary). Adjusting the CO2 by pressing the RESET button for 5 sec.. Complete ........................................... 9. Set the heating power. 10. Balance the central heating circuit. 11. Check the operation in DHW mode. Complete ........................................... Complete ........................................... Complete ........................................... 12. Adjust DHW flow rate on the boiler (if necessary). 13. Check gas rate. 14. Check the ionisation current. Complete ........................................... Complete ........................................... Complete ........................................... 15. Explain to the end user the working of the boiler. Complete ........................................... 28 /

COMMISSIONING Start-up procedure Press the ON/OFF button on the control panel to switch on the boiler: the display will light up. The initialisation procedure - indicated by the bar - begins. Wi-Fi bo Initializing....... Once the procedure is completed, the display will visualise the temperatures set for the central heating and domestic hot water circuits (display configuration: boiler base). 00/00/00 00:00 42° 1,5 bar 70° Press OK to enter Menu The boiler will request the setting of the date, time and language. Proceed as indicated in the USER MENU - see the User’s Manual. FIRST IGNITION CARRY OUT THE DEAERATION CYCLE AND AUTOMATIC CALIBRATION 1. Assicurarsi che: - The gas valve is closed; - The electrical connection has been properly carried out. Make sure that, in any case, the green/yellow earthing wire is connected to an efficient earthing system; - Unscrew the cap on the automatic air relief valve; - The exhaust duct for combustion products should be suitable and free from any obstructions; IMPORTANT! DURING THE CALIBRATION PROCEDURE AND MEASUREMENT OF THE CO2 VALUE, IT’S IMPORTANT THAT THE BOILER WORKS WITH THE FRONT COVER CLOSED AND THE AIR/ FUMES DUCTS FULLY ASSEMBLED. - Any necessary ventilation inlets in the room should be open (type B installation). - Check whether the condense trap contains water; if not, it must be refilled. If necessary, open the manual air vent on the main exchanger until complete filling. N.B.: if the boiler will not be used for long periods, the trap should be filled before the boiler is started up again. It is dangerous not to refill the siphon as fumes may be released into the environment. 2. Supply static pressure check Loosen the screw 1 and insert the pressure gauge connection pipe into the pipe tap. The supply pressure should correspond to the value established in relation to the type of gas, for which the boiler is designed see Table summarising changes. IN ATTENTION!! THE BOILER CAN NOT BE ACTIVATED IF THE PRESSURE IS NOT CORRESPONDING TO THE TABLE SUMMARISING CHANGES. / 29

MANUALS