MAINTENANCE GUIDE 5 ANNUAL MAINTENANCE Ignition & detection electroded Maintenance Interval : Annually How : Visual inspection / Clean as necessary / Distance from the burner / Ionisation current more than 1 µA Burner Maintenance Interval : Annually How : Visual inspection / Clean as necessary Fan Maintenance Interval : Annually How : Visual inspection / Clean as necessary Primary heat exchanger Maintenance Interval : Annually How : Visual inspection / Clean as necessary Condensate trap Maintenance Interval : Annually or after cleaning primary heat exchanger How : Visual inspection / Clean as necessary / Add water before replacing 60
GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. Customer Name Telephone Number Address Boiler Make and Model Boiler Serial Number Commissioned by (print name) CORGI ID Number Company Name Telephone Number Company Address Commissioning Date To be completed by the customer on receipt of a Building Regulations Compliance Certificate* : Building Regulations Notification Number (if applicable) CONTROLS Tick the appropriate boxes Time and Temperature Control to Heating Room Thermostat and Programmable Load/Weather Optimum Start Programmer/Timer Room Thermostat Compensation Control Time and Temperature Control to Hot Water Cylinder Thermostat and Programmer/Timer Combination Boiler Heating Zone Valves Fitted Not Required Hot Water Zone Valves Fitted Not Required Thermostatic Radiator Valves Fitted Not Required Automatic Bypass to System Fitted Not Required Boiler Interlock ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions What system cleaner was used? Provided What inhibitor was used? Quantity litres CENTRAL HEATING MODE Measure and Record: Gas Rate m 3 /hr OR ft 3 /hr Burner Operating Pressure (if applicable) mbar OR Gas Inlet Pressure mbar Central Heating Flow Temperature °C Central Heating Return Temperature °C COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No If yes, has a water scale reducer been fitted? Yes No What type of scale reducer has been fitted? DOMESTIC HOT WATER MODE Measure and Record: Gas Rate m 3 /hr OR ft 3 /hr Burner Operating Pressure (at maximum rate) mbar OR Gas Inlet Pressure (at maximum rate) mbar Cold Water Inlet Temperature °C Hot water has been checked at all outlets Yes Temperature °C Water Flow Rate l/min Yes CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 ALL INSTALLATIONS If required by the manufacturer, record the following CO 2 % OR CO ppm OR CO/CO 2 Ratio The heating and hot water system complies with the appropriate Building Regulations The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions The operation of the boiler and system controls have been demonstrated to and understood by the customer The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Yes Yes Yes Yes Commissioning Engineer’s Signature Customer’s Signature (To confirm satisfactory demonstration and receipt of manufacturer’s literature) * All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer. ©Heating and Hotwater Industry Council (HHIC) www.centralheating.co.uk
Gas fired condensing wall hung boil
overview These instructions are sui
overview Safety regulations Key to
Overall view 1 2 product descriptio
Loading...
Loading...
MAINTENANCE GUIDE 5 ANNUAL MAINTENANCE Ignition & detection electroded Maintenance Interval : Annually How : Visual inspection / Clean as necessary / Distance from the burner / Ionisation current more than 1 µA Burner Maintenance Interval : Annually How : Visual inspection / Clean as necessary Fan Maintenance Interval : Annually How : Visual inspection / Clean as necessary Primary heat exchanger Maintenance Interval : Annually How : Visual inspection / Clean as necessary Condensate trap Maintenance Interval : Annually or after cleaning primary heat exchanger How : Visual inspection / Clean as necessary / Add water before replacing 60
GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. Customer Name Telephone Number Address Boiler Make and Model Boiler Serial Number Commissioned by (print name) CORGI ID Number Company Name Telephone Number Company Address Commissioning Date To be completed by the customer on receipt of a Building Regulations Compliance Certificate* : Building Regulations Notification Number (if applicable) CONTROLS Tick the appropriate boxes Time and Temperature Control to Heating Room Thermostat and Programmable Load/Weather Optimum Start Programmer/Timer Room Thermostat Compensation Control Time and Temperature Control to Hot Water Cylinder Thermostat and Programmer/Timer Combination Boiler Heating Zone Valves Fitted Not Required Hot Water Zone Valves Fitted Not Required Thermostatic Radiator Valves Fitted Not Required Automatic Bypass to System Fitted Not Required Boiler Interlock ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions What system cleaner was used? Provided What inhibitor was used? Quantity litres CENTRAL HEATING MODE Measure and Record: Gas Rate m 3 /hr OR ft 3 /hr Burner Operating Pressure (if applicable) mbar OR Gas Inlet Pressure mbar Central Heating Flow Temperature °C Central Heating Return Temperature °C COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No If yes, has a water scale reducer been fitted? Yes No What type of scale reducer has been fitted? DOMESTIC HOT WATER MODE Measure and Record: Gas Rate m 3 /hr OR ft 3 /hr Burner Operating Pressure (at maximum rate) mbar OR Gas Inlet Pressure (at maximum rate) mbar Cold Water Inlet Temperature °C Hot water has been checked at all outlets Yes Temperature °C Water Flow Rate l/min Yes CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 ALL INSTALLATIONS If required by the manufacturer, record the following CO 2 % OR CO ppm OR CO/CO 2 Ratio The heating and hot water system complies with the appropriate Building Regulations The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions The operation of the boiler and system controls have been demonstrated to and understood by the customer The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Yes Yes Yes Yes Commissioning Engineer’s Signature Customer’s Signature (To confirm satisfactory demonstration and receipt of manufacturer’s literature) * All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer. ©Heating and Hotwater Industry Council (HHIC) www.centralheating.co.uk
Gas fired condensing wall hung boil
overview These instructions are sui
overview Safety regulations Key to
Overall view 1 2 product descriptio
Loading...
Loading...
X