commissioning FIRST IGNITION OPERATION Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installer . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Check the electrical supply. 2. Check the type of gas and change the gas if necessary. 3. Check the gas tightness. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 4. Measure the gas inlet standing pressure 5. Check the flue installation. See page 21 - 28…. 6. Fill the installation. See page 35…. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 7. Check the hydraulic water tightness. 8. Set the heating power. See page 38…. 9. Balance the central heating circuit. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 10. Measure the gas inlet working pressure. 11. Check the boiler combustion. 12. Gas rate the appliance. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 13. Explain to the end user how to use the boiler/ timer/control Complete . . . . . . . . . . . . . . . . . . . . 14. Complete the Benchmark Log Book (page 61) Complete . . . . . . . . . . . . . . . . . . . . 36
commissioning Ignition procedure Press the ON/OFF button on the control panel to switch on the boiler. The display shows: The operating mode will be indicated by the three figures marked out on the diagram above. The first figure indicates the operating mode: 0 XX - Stand-by C XX - Boiler active c XX - “CH External Pump Overrun” - Heating external pump overrun F XX - -Anti-freeze protection enabled The second and third figures indicate: - the flow temperature when no heating requests have been made - the flow temperature in heating mode - the flow temperature in anti-freeze mode. Electricity supply - Check that the voltage and frequency of the electricity supply correspond to the data shown on the boiler data plate; - Make sure that the earthing connection is efficient. First ignition 1. Make sure that: - The gas valve is closed; - The electrical connection has been properly carried out. Make sure that, the green/yellow earthing wire is connected to an efficient earthing system; - Switch on the boiler (by pressing the ON/OFF button) - Bleed the air from the system; - The flue system should be suitable and free from any obstructions; 2. Open the gas isolating valve and check the connection seals, including the boiler connection joints, making sure that the meter does not detect any passage of gas. Eliminate any leaks. 3. Start the boiler by turning on the time control + ensure thermostats are calling for heat. 37
Loading...
Loading...
commissioning FIRST IGNITION OPERATION Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installer . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Check the electrical supply. 2. Check the type of gas and change the gas if necessary. 3. Check the gas tightness. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 4. Measure the gas inlet standing pressure 5. Check the flue installation. See page 21 - 28…. 6. Fill the installation. See page 35…. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 7. Check the hydraulic water tightness. 8. Set the heating power. See page 38…. 9. Balance the central heating circuit. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 10. Measure the gas inlet working pressure. 11. Check the boiler combustion. 12. Gas rate the appliance. Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . Complete . . . . . . . . . . . . . . . . . . . . 13. Explain to the end user how to use the boiler/ timer/control Complete . . . . . . . . . . . . . . . . . . . . 14. Complete the Benchmark Log Book (page 61) Complete . . . . . . . . . . . . . . . . . . . . 36
commissioning Ignition procedure Press the ON/OFF button on the control panel to switch on the boiler. The display shows: The operating mode will be indicated by the three figures marked out on the diagram above. The first figure indicates the operating mode: 0 XX - Stand-by C XX - Boiler active c XX - “CH External Pump Overrun” - Heating external pump overrun F XX - -Anti-freeze protection enabled The second and third figures indicate: - the flow temperature when no heating requests have been made - the flow temperature in heating mode - the flow temperature in anti-freeze mode. Electricity supply - Check that the voltage and frequency of the electricity supply correspond to the data shown on the boiler data plate; - Make sure that the earthing connection is efficient. First ignition 1. Make sure that: - The gas valve is closed; - The electrical connection has been properly carried out. Make sure that, the green/yellow earthing wire is connected to an efficient earthing system; - Switch on the boiler (by pressing the ON/OFF button) - Bleed the air from the system; - The flue system should be suitable and free from any obstructions; 2. Open the gas isolating valve and check the connection seals, including the boiler connection joints, making sure that the meter does not detect any passage of gas. Eliminate any leaks. 3. Start the boiler by turning on the time control + ensure thermostats are calling for heat. 37
Loading...
Loading...
CATALOGUE
PRODUCT BROCHURES
DATASHEETS
INSTALLATION MANUALS
MANUALS (DISCONTINUED)
PLANNER MANUALS
CASE STUDIES