Views
2 years ago

CLAS HE R - Installation & Servicing Manual

  • Text
  • Wwwaristoncom
  • Manual
  • Servicing
  • Clas
  • Terminal
  • Installation
  • Appliance
  • Heating
  • Boiler
  • Flue

installation Gas

installation Gas connection Make sure, using the labels on the packaging and the data plate on the appliance itself, that the boiler is in the correct country and that the gas category for which the boiler was designed corresponds to one of the categories available in the country where it will be used. The gas supply piping must be created and measured out in compliance with specific legal requirements and in accordance with the maximum power of the boiler; ensure the gas isolation valve is connected correctly, see drawing opposite. Check that the supplied gas corresponds to the type of gas for which the boiler was designed (see the data plate located on the appliance itself). It is also important to check that the pressure of the gas (methane or LPG) you will be using to feed the boiler is suitable, because if it is insufficient the power may be reduced, causing inconvenience for the user. C. Gas Inlet C Central Heating connection A B Drain Off Cocks A. Central Heating Return (pipes 22mm) B. Central Heating Flow Note: For IE use 3/4"» + 1/2" olives provided 18

Instructions for opening the casing and performing an internal inspection Before performing any work on the boiler, first disconnect it from the electrical power supply using the external bipolar switch, removing the fuse and shutting off the gas valve. To access the inside of the boiler, the following is necessary: 1. Loosen the two screws on the front casing (a), pull it forwards and unhook it from the upper pins (b) 3. Remove the control panel (c) 4. Unhook the two clips on the combustion chamber panel and lift off (d). (c) installation (a) (b) (d) 19

INSTALLATION MANUALS

Views
2 years ago

CLAS HE R - Installation & Servicing Manual

  • Text
  • Wwwaristoncom
  • Manual
  • Servicing
  • Clas
  • Terminal
  • Installation
  • Appliance
  • Heating
  • Boiler
  • Flue

installation Gas

installation Gas connection Make sure, using the labels on the packaging and the data plate on the appliance itself, that the boiler is in the correct country and that the gas category for which the boiler was designed corresponds to one of the categories available in the country where it will be used. The gas supply piping must be created and measured out in compliance with specific legal requirements and in accordance with the maximum power of the boiler; ensure the gas isolation valve is connected correctly, see drawing opposite. Check that the supplied gas corresponds to the type of gas for which the boiler was designed (see the data plate located on the appliance itself). It is also important to check that the pressure of the gas (methane or LPG) you will be using to feed the boiler is suitable, because if it is insufficient the power may be reduced, causing inconvenience for the user. C. Gas Inlet C Central Heating connection A B Drain Off Cocks A. Central Heating Return (pipes 22mm) B. Central Heating Flow Note: For IE use 3/4"» + 1/2" olives provided 18

Instructions for opening the casing and performing an internal inspection Before performing any work on the boiler, first disconnect it from the electrical power supply using the external bipolar switch, removing the fuse and shutting off the gas valve. To access the inside of the boiler, the following is necessary: 1. Loosen the two screws on the front casing (a), pull it forwards and unhook it from the upper pins (b) 3. Remove the control panel (c) 4. Unhook the two clips on the combustion chamber panel and lift off (d). (c) installation (a) (b) (d) 19